requirements coverage for ready (not draft) tests
The requirements status field shows if requirements are linked to tests. However, it doesn't show if they are linked to tests with status of ready rather than draft. If we had a field for this (perhaps requirements coverage status) we could see clearly how many requirements were linked to properly specified tests. The field could have values 'tests - ready', 'tests - draft' on 'no tests'.
1
vote
James
shared this idea
Ido Tandy
responded